CRC goes to School

A previous foundation repair left several rooms in an elementary school with significant voids, which needed to be filled before the end of summer.  Jobs like these require more work on the front end to ensure they are completed quickly and cleanly.

fr_1289_size1024

The engineer called for a grout to stabilize/void fill the observed voids.  We used our volumetric mixers to batch over 100 cubic yards on-site and pumped the grout over 3 days.